Multistage Well points | Building Construction


Multistage Well points | Civil Engineering Projects


In our previous article, we discussed "Single stage Well Points". Now we will move on with our discussion on "Multistage Well points".

When the water table is to be lowered for a depth greater than 6m, multistage well points are required. In this method, two or more rows of well points are installed at different elevations.



How is the installation of Well points done?
The installation of well points is done in stages. The first stage well points are located near the perimeter of the area, as in a single stage well point system. These are put into operation and the water table is lowered by about 5m depth is done.

Thus the total depth of excavation becomes about 10. If required, the third stage of well points can also be installed to further lower the water table.
The method is useful for excavations upto 15m depth. Excavations exceeding 15m depth are generally dewatered by a deep well system.


We will also discuss the following in our succeeding articles:

  • Vacuum Well Points
  • Shallow Well System
  • Deep Well System
  • Horizontal Wells

Friday, September 16, 2011

Structural Design Disaster | Building Construction

A lesson for all the Civil Engineers to learn
"Structural Engineering is a field that deals with the analysis and design of structures that support or resist loads".
In this article, we will discuss a project in which Structural Design (Column Layout) had already been executed on site which was absolutely incorrect. After the erection of columns, the owner hired an Architect to design a Hostel for him.
I feel that not only Civil engineering students and civil engineers must understand the importance of making correct column layouts for the buildings. It is also the job of an Architect to give the column positions in the plan which works like a guideline for the Civil Engineer.

Now we will move on with our discussion on the reaction of the Architect after analyzing the Column Layout made by a Civil Engineer...